After painting or spray,the paint can be formed after the film played, so should give full play to paint the performance necessary to correct and complete construction.
1. Learn painting method of construction in accordance with the regulations:
Different systems of painting, with its different properties and use of the pre-construction To learn more about product use and application requirements.
2. To complete the surface treatment:
Surface Treatment of appropriate or not, the film's performance and life expectancy has greatly affected, it is necessary to remove the surface-thorn, dust, grease and other foreign body, and to ensure that the moisture content of the substrate requirements of the local wood to dry the moisture content of a balance.
3. Mixing paint should be fully uniform:
The use of paint should be provided when the ratio method, the full uniform after mixing with filters filtering paint, primer (120 head to 150 head), finish (150 head to 200 head), after the filter, such as standing after 15 minutes Further construction. With good paint requirements in four hours of unused, or diminish the possible adhesion and gloss change, and other ills dumb.
4. Avoid the construction of low-temperature and humid climate:
Temperatures dropped to below 5 ℃, the extremists will reduce drying of the paint. At the same time in more than 85 RH% humidity, will have become white. by light, even affect the adhesion properties, should be avoided in such cases construction.
5. Avoid direct sun under construction:
Temperatures increased to help paint dry, but Sun insolated, especially in the summer sun insolated, it is easy to produce bubbles, and so, therefore, it is best to avoid the sun insolated under construction.
6. Diluent amount of attention, no one shall be arbitrarily increase driers:
too dense paints such as the need for dilute, attention should be paid to the deployment of its volume, and shall not affect masking power of the film thickness. Under normal circumstances no more than 5% of the principle of driers easily lead to the table dry,the phenomenon with no dry will appear, and after drying remain in the film in the film to continue to promote the aging.
7. Construction of adhesion between the layers to be noted:
To ensure that the paint layer adhesion, End of a paint should be dried thoroughly polished to remove dust, and then a second painting, construction, or may cause negative film adhesion.
8. In order to ensure product quality, use of the Company matching products:
Paint stored for a period of time and found layered is normal, when Jiaoyun used to use, the holding period after the test can still be assured of qualified use. The company's products are the stringent laboratory tests to ensure product quality requirements of customers, supporting the use of the Company's products.
|